I am sure that some of you have done this before, but I haven't, so I did. I had to get my trains off of the floor, so I cut a piece of plywood, 4x8, into 8 lengths and grooved them for track, saved about 300.00. The eight pieces gave me 64 feet of shelving. Bob.