Jump to content

Expansion Track Work


Jerry B44
 Share

Recommended Posts

Finally got started on building the inside loop, that I had always planned. Put in some switches to be abloe to move from the inside to the outside also.  I use SVRR track and switches.

IMG_0821.JPG.860172fb40f6080c7756e77223a9507d.JPG

The metal bridge has two tracks. the inside loop heads over towards the covered bridge.

IMG_0822.JPG.1a2cc3212d34525f25683b45c1b7efe7.JPG

Helps to sit on something, old guys have a hard time getting off the ground! Not sure about running on mulch, will see how that works out. No source of chicken grit around here.

Link to comment
Share on other sites

 
 

Well, I got the mulch at True Value. I used to get chicken grit in 50 lb bags in Nebraska at the local feed store, but no one around here has any. Gravel place here as some gravel that is jagged and holds in place, but it's sorta big, about 1/2" but may use it anyway. No rush.

Link to comment
Share on other sites

 
  • 3 months later...
 
 
 
 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
  • Create New...