Jump to content

Prototypical Northern Pacific MOW-1


Loco Larry
 Share

Recommended Posts

APRIL FOOLS!!!! The attached pics show what I use for releveling the 200' of mainline track along with a 30' passing siding and 30' staging track on my NP Garden Railroad. My roadbed is roughly 4" deep of crusher dust. With the winter frost and heaving and lowering. It only takes me about an hour to do it in spring and I might do it again in midsummer. MOW-2 is on the production schedule. It will be a gondola which will hold my 6" level for super elevation around my 12' radius curves. Greetings from Green Bay, Wis. USA. Have a great spring nd summer

DSCN5207.JPG

DSCN5206.JPG

Link to comment
Share on other sites

 
 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
  • Create New...