Jump to content

My logging and mining railroad


PRL&MRailroad
 Share

Recommended Posts

 
 
 
 
 
 
 
 
 

Its not so much the weather but the change of seasons, all the fall leaves and acorns to clean up in the spring and ballast repair after a heavy rain. I deal with the weeds with roudup and always have a sprayer tank full and ready to go. Of coarse there is the ocasional damage from fallen tree limbs a deer stepping on track. All and all it is like operating a real railroad.

 

With me it is all about running trains so I set up some track on my side porch in the fall. This year I set up a double loop and when it is very cold outside I just run the trains while sitting inside the kitchen door with a hot cup of coffee.

 

........Jim

Link to comment
Share on other sites

 
  • 3 weeks later...
 
 
 
  • 2 weeks later...
 
 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
  • Create New...