July 7, 20197 yr I don't remember if it was on this or another forum I saw the tip, but I bought the GB (Gardner Bender) Ox-Gard Anti-Oxidant Compound from Amazon.com. Maybe there are better ones?
July 15, 20197 yr On 6/29/2019 at 1:56 PM, rbrown7713 said: They are neat, I will look into those, where do I get them? Thanks, Will they fit code 250 Sunset Valley RR. Track? Bob. I prefer the clamps that SVRR sells. Fits between the ties real nice, hold up for a long time. I find the split jaws a pain they way they are always rotating around. They do have them for code 250 I know. Check Reindeer Pass.
July 19, 20197 yr Author Thanks Jerry. I have slowed on laying the track as I am pouring about 16 yards of concrete, filling in the center of the layout and between the layout and the house, no more grass to deal with. Bob.
July 19, 20197 yr Some times hiring some one can be priceless … Your seem to getting smarter in your old age ..going against the norm …
July 20, 20197 yr I hire a lot anymore, if I can afford it, if I do too much the wear and tear on the old body is not worth it.
July 22, 20197 yr Bob, I like that. Previous owner removed most of the trees in my yard and some days it just gets too hot to enjoy the trains. Life will now get even better.
July 22, 20197 yr 2 hours ago, Screwy Nick said: Bob, I like that. Previous owner removed most of the trees in my yard and some days it just gets too hot to enjoy the trains. Life will now get even better. It could be worse … you could live in Florida.. Oh wait … that's were Bob lives...
July 22, 20197 yr Author It might be my age, but when I was younger, a long time ago, I would pray for the sun, but, not now, it is my enemy. Bob.
July 22, 20197 yr Bob, I never was a fan of the beating down sun but didn't mind it. As I get older I'm liking it less also. Since loosing my hair I've found my head sweats. LiG
July 22, 20197 yr Author What's a beach? Does It look anything like 3 yards of fill dirt that I have to move for fill? If it does, deal me out. Bob.
September 23, 20197 yr Author No, not yet, just got all of the concrete poured and the next step is to order about 300 feet of track and then lay it. Almost there, Bob.
September 23, 20197 yr I hope you go with code 250, makes the trains look a LOT more in scale and like a model, not a toy. I use SVRR for the last 30 years.
October 1, 20197 yr Author I just ordered 280 ft. of track from Sunset Valley Railroad and will start laying track as soon as it gets here. I should be running trains by Christmas or sooner, Bob.
October 1, 20197 yr I use a di-electric compound on each connector, helps to give good track power. Car stores have it.
October 3, 20197 yr Author Here is the start of the track laying. I have to add one switch and the switches will be complete. My T1 was tested today on the 10 ft. radius and it made it OK, I was worried about that. Bob.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.