April 19, 20197 yr Author Let's save the cork until after I lay my track, well ok, maybe just one shot. Bob.
May 10, 20197 yr Author I have been building cabinets to house the track layout in the house. Here you see 18 feet of cabinets and have 2 more rooms to go. I will not only be building the lower shelf for the trains, 3 tracks, 45 ft. long, but will build shelves above them for storage. Bob.
May 10, 20197 yr Author I try not to. Thanks Jerry, now I have two more rooms to do before I start laying track, but it keeps me busy. What projects are you doing? Bob.
May 11, 20197 yr I am painting some GT cars to match the Chessie E-7 I got. Finked out and left them the short length, my projects stretch out so long I'd probably not get them done for a year if I lengthened them. Skytop lounges I lengthened are still on the workbench. Lettering mostly. Starting to lay a inner loop on my layout, dug thru the track I brought down and found some curves that I won't need to change too much with my dual rail bender.
May 11, 20197 yr Author Sounds like that you are as busy as I am. I want to finish this layout so that I can get back to building and modifying cars, as that is what I really like. Tell me all about your dual rail bender and how happy you are with it. I have one too, but have never used one. Show me one of your Chessie cars painted, because I am going to do the same thing for my E-7, Bob.
May 13, 20197 yr Bob It's been a while what engine / engines do you have to pull all them fabulous cars ?
May 13, 20197 yr Author I have two E8's, one T1, F7's, MTH Alco ABA's, Challenger, 2 P42 Genesis', and 1 E7. Bob.
May 28, 20197 yr Author I haven't bought any yet, but I will be buying about 450 ft. and not looking forward to laying all of that. Bob.
May 28, 20197 yr Author I have tried cookin some of those tracks and could never get them tender enough to eat, I guess I'm doing something wrong. Bob.
June 7, 20197 yr Author OK, here is the last room with the cabinets. I discovered that I have room for 4 tracks instead of 3, so that gives me 50 more feet of parking, totaling 200 feet. I just ordered 200 feet of track to get me started. I am using SSVR track and switches. Bob.
June 7, 20197 yr Be quite the setup Bob. SVRR is the best, I've had it for 30 years, switches also are great. I like the ground throws, trip over the ones that stick up it seems.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.