Jump to content

working on the RR


enginear joe
 Share

Recommended Posts

 I'm getting things straightened out and I can't wait. I need to pull some big trains!

Tried some tankers to check the track work. I need to get some more mainline done. I noticed that some of what's already laid, needs more ballast. The rain did it's job. Settling in must take some time. I noticed that it's slowing down and started to form a hard base that even I can walk on.

post-10-0-76462300-1405549080.jpg

post-10-0-18341800-1405549101.jpg

post-10-0-39250600-1405549144.jpg

Link to comment
Share on other sites

 
 
 
 
 
 

Well that's it for now. It was 80 something today with high humidity. I couldn't even move without sweat pouring off me or into my eyes. Tomorrow will be the same except in the 90s. I'm shutting her down!!

Wednesday all rain. Thursday..... See ya next month!! (or Sept!)

I worked inside installing a BCR2 into an older dash 8. Nice and cool in the basement. Why'd I move??

Link to comment
Share on other sites

 
 
 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
  • Create New...